Сериальное издание: Power Technology and Engineering
Страницы: 681-686
Аннотация
The Chirkey hydroelectric power plant dam is investigated using the coherent restoration of standing wave fields at maximum and minimum upstream levels. The features of seasonal changes in natural frequencies and modes are also determined. The results are intended to monitor the technical condition of the dam.